{"operation":"document","citation":"PHMSA 19-152454","title":"MUSTANG PIPE LINE LLC — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2019-02-22","effective_on":"2019-02-22","summary":"HAZARDOUS LIQUID in IL; REPAIR; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-19-152454-operator-31166.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-19-152454-operator-31166.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-19-152454-operator-31166","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"ExxonMobil Pipeline Company (EMPCo), on behalf of Mustang Pipeline Partners (Mustang), is making notification to PHMSA of two, one hundred and eighty-day repair conditions that will not be remediated within the 195.452(h)(4)(ii) schedule.","truncated":false,"body_characters":238}