# MUSTANG PIPE LINE LLC — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 19-152454
- **title:** MUSTANG PIPE LINE LLC — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2019-02-22
- **effective on:** 2019-02-22
- **summary:** HAZARDOUS LIQUID in IL; REPAIR; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-19-152454-operator-31166.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-19-152454-operator-31166.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-19-152454-operator-31166
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

ExxonMobil Pipeline Company (EMPCo), on behalf of Mustang Pipeline Partners (Mustang), is making notification to PHMSA of two, one hundred and eighty-day repair conditions that will not be remediated within the 195.452(h)(4)(ii) schedule.
- **truncated:** false
- **body characters:** 238
