# EXXONMOBIL PIPELINE COMPANY LLC — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 19-152760
- **title:** EXXONMOBIL PIPELINE COMPANY LLC — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2017-12-15
- **effective on:** 2017-12-15
- **summary:** HAZARDOUS LIQUID in LA; REPAIR; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-19-152760-operator-4906.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-19-152760-operator-4906.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-19-152760-operator-4906
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

Update: Pursuant to §195.452(h)(ii), ExxonMobil Pipeline Company (EMPCo) hereby provides the 2nd long-term pressure reduction notification for SRC #20170055 ~ originally filed on May 10, 2017. There are seventeen (17) 180-Day Repair Conditions remaining, and EMPCo will likely complete repairs by end of 3rd quarter 2019. On March 19, 2019, EMPCo completed a successful hydrotest of the pipeline system with no failures. The 20-percent pressure reduction, however, will remain in place until completion of all 180-Day Repair Conditions. Pursuant to §195.452 ExxonMobil Pipeline Company (EMPCo) hereby gives the office of Pipeline and Hazardous Materials Safety Administration (PHMSA), notice of six (6) Sixty Day Repair and one hundred eighty four (184) 180 Day Repair conditions that will not be remediated within the regulatory schedule due to the Coastal Zone Management permitting process.
- **truncated:** false
- **body characters:** 893
