# PLAINS MARKETING, L.P. — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 19-152908
- **title:** PLAINS MARKETING, L.P. — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2018-05-25
- **effective on:** 2018-05-25
- **summary:** HAZARDOUS LIQUID in CA; PRESSURE; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-19-152908-operator-26085.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-19-152908-operator-26085.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-19-152908-operator-26085
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

Per 49 CFR 195.452(h)(1)(ii), this email serves as notification to PHMSA that Plains West Coast Terminals (Intra-Sate, Crude Oil) Pipelines 528/529 (Dominguez Hills to Cerritos Channel segment), operated under Operator ID#26085 (Plains Marketing), will be exceeding 365 days on a pressure reduction originally taken on May 26, 2017, due to unrepaired 180-day (timed) anomalies.
- **truncated:** false
- **body characters:** 377
