# WOLVERINE PIPELINE CO — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 19-152916
- **title:** WOLVERINE PIPELINE CO — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2018-10-26
- **effective on:** 2018-10-26
- **summary:** HAZARDOUS LIQUID in IN; PRESSURE; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-19-152916-operator-22830.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-19-152916-operator-22830.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-19-152916-operator-22830
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

As required in 49 CFT Part 195.452 (h)(1)(ii), Wolverine Pipe Line Company is reporting a pressure reduction exceeding 365 days. Reason for exceedance:Location has significant challenges associated with permitting and accessing the anomaly under a busy four lane Road within the Army Corps of Engineers Little Calumet River levee system. Planning is actively underway but additional time is needed to ensure that a safe plan is developed to perform the work and that all required permits (USACE, IDEM, IDNR, IDOT) are obtained. Estimated completion of the repair is during the 2nd Quarter of 2019.
- **truncated:** false
- **body characters:** 597