{"operation":"document","citation":"PHMSA 19-155713","title":"EXXONMOBIL OIL CORPORATION — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2019-07-08","effective_on":"2019-07-08","summary":"HAZARDOUS LIQUID in TX; REPAIR; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-19-155713-operator-12624.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-19-155713-operator-12624.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-19-155713-operator-12624","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"Pursuant to Section 195.452(h)(3), Exxon Mobil Pipeline Company (EMPCo), on behalf of Exxon Mobil Oil Corporation (EMOC), is providing the attached Integrity Management Notification for the MR-1 iso-butane pipeline system, where thirty-two (32) 180-day repair conditions will not be remediated within the 195.452 (h)(4)(iii) schedule. This is due to the overall number of conditions requiring repairs associated with this tool run.","truncated":false,"body_characters":431}