# EXXONMOBIL OIL CORPORATION — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 19-155713
- **title:** EXXONMOBIL OIL CORPORATION — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2019-07-08
- **effective on:** 2019-07-08
- **summary:** HAZARDOUS LIQUID in TX; REPAIR; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-19-155713-operator-12624.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-19-155713-operator-12624.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-19-155713-operator-12624
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

Pursuant to Section 195.452(h)(3), Exxon Mobil Pipeline Company (EMPCo), on behalf of Exxon Mobil Oil Corporation (EMOC), is providing the attached Integrity Management Notification for the MR-1 iso-butane pipeline system, where thirty-two (32) 180-day repair conditions will not be remediated within the 195.452 (h)(4)(iii) schedule. This is due to the overall number of conditions requiring repairs associated with this tool run.
- **truncated:** false
- **body characters:** 431
