{"operation":"document","citation":"PHMSA 19-157125","title":"NUSTAR PIPELINE OPERATING PARTNERSHIP L.P. — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2019-07-19","effective_on":"2019-07-19","summary":"HAZARDOUS LIQUID in MO; INTERVAL; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-19-157125-operator-10012.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-19-157125-operator-10012.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-19-157125-operator-10012","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"The assessment interval defined in 49 CFR 195.452 (j)(3) will be exceeded due to multiple incomplete tool runs. A geometry tool was run on 03/07/17 and 06/25/19. Both geometry runs were successful and resulted in 100% sensor coverage. A MFL tool was run on 03/09/17 resulting in 62% sensor coverage. An additional MFL tool was run on 06/26/19 and became stationary in the pipeline. See &quot;Basis&quot; section below for full timeline of attempted assessments.","truncated":false,"body_characters":461}