# NUSTAR PIPELINE OPERATING PARTNERSHIP L.P. — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 19-157125
- **title:** NUSTAR PIPELINE OPERATING PARTNERSHIP L.P. — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2019-07-19
- **effective on:** 2019-07-19
- **summary:** HAZARDOUS LIQUID in MO; INTERVAL; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-19-157125-operator-10012.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-19-157125-operator-10012.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-19-157125-operator-10012
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

The assessment interval defined in 49 CFR 195.452 (j)(3) will be exceeded due to multiple incomplete tool runs. A geometry tool was run on 03/07/17 and 06/25/19. Both geometry runs were successful and resulted in 100% sensor coverage. A MFL tool was run on 03/09/17 resulting in 62% sensor coverage. An additional MFL tool was run on 06/26/19 and became stationary in the pipeline. See &quot;Basis&quot; section below for full timeline of attempted assessments.
- **truncated:** false
- **body characters:** 461
