{"operation":"document","citation":"PHMSA 19-164209","title":"ALYESKA PIPELINE SERVICE CO — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2019-10-02","effective_on":"2019-10-02","summary":"HAZARDOUS LIQUID in AK; REPAIR; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-19-164209-operator-26149.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-19-164209-operator-26149.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-19-164209-operator-26149","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"Per Section 195.452 (h)(3), Alyeska is notifying PHMSA of a delay of investigation and remediation of 180-day condition discovered at Pipeline Milepost (PLMP) 394 of the Trans Alaska Pipeline System (TAPS). The condition was discovered April 2, 2019, requiring further investigation and remediation by September 28, 2019. Additional details are available in the attachment.","truncated":false,"body_characters":373}