{"operation":"document","citation":"PHMSA 19-164543","title":"NUSTAR PIPELINE OPERATING PARTNERSHIP L.P. — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2019-10-03","effective_on":"2019-10-03","summary":"HAZARDOUS LIQUID in MO; INTERVAL; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-19-164543-operator-10012.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-19-164543-operator-10012.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-19-164543-operator-10012","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"The assessment interval defined in 49 CFR 195.452 (j)(3) will be exceeded due to multiple incomplete tool runs. A successful MFL tool was received on 05/31/19. Three (3) geometry runs have been attempted on 1/15/19, 5/28/19, and 9/16/19 resulting in incomplete data for assessment. See &quot;Basis&quot; section below for a full timeline of attempted assessments.","truncated":false,"body_characters":363}