# NUSTAR PIPELINE OPERATING PARTNERSHIP L.P. — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 19-164543
- **title:** NUSTAR PIPELINE OPERATING PARTNERSHIP L.P. — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2019-10-03
- **effective on:** 2019-10-03
- **summary:** HAZARDOUS LIQUID in MO; INTERVAL; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-19-164543-operator-10012.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-19-164543-operator-10012.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-19-164543-operator-10012
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

The assessment interval defined in 49 CFR 195.452 (j)(3) will be exceeded due to multiple incomplete tool runs. A successful MFL tool was received on 05/31/19. Three (3) geometry runs have been attempted on 1/15/19, 5/28/19, and 9/16/19 resulting in incomplete data for assessment. See &quot;Basis&quot; section below for a full timeline of attempted assessments.
- **truncated:** false
- **body characters:** 363
