{"operation":"document","citation":"PHMSA 19-166007","title":"MOEM PIPELINE LLC — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2019-10-22","effective_on":"2019-10-22","summary":"HAZARDOUS LIQUID in LA; PRESSURE; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-19-166007-operator-31167.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-19-166007-operator-31167.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-19-166007-operator-31167","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"Pursuant to §195.452(h)(3), §195.452(h) (1)(i), and §195.452(h) (1)(ii) PBF Energy Inc. (PBF), on behalf of MOEM Pipeline LLC (OPID 31167), hereby gives the office of Pipeline and Hazardous Materials Safety Administration (PHMSA) notice of a pressure reduction exceeding 365 days. The original 20% temporary pressure reduction was taken on 11/01/2018 due to immediate repair conditions not being remediated within the regulatory required time frame.","truncated":false,"body_characters":449}