# NUSTAR PIPELINE OPERATING PARTNERSHIP L.P. — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 20-173152
- **title:** NUSTAR PIPELINE OPERATING PARTNERSHIP L.P. — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** current
- **official:** true
- **published on:** 2020-01-22
- **effective on:** 2020-01-22
- **summary:** HAZARDOUS LIQUID in IA; PRESSURE; PHMSA status: UNDER REVIEW.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-20-173152-operator-10012.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-20-173152-operator-10012.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-20-173152-operator-10012
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

This is a notification of a Long-Term Pressure Reduction defined in 49 CFR § 195.452 (h)(1)(ii). On January 18, 2019, NuStar Pipeline Operating Partnership L.P. implemented a pressure reduction of 920 psi on the Council Bluffs to Whiskey Creek 6” pipeline segment in response to an overdue 60-day feature (as defined in 49 CFR § 195.452 (h)(4)(ii)(B)). Flooding in the area has prevented safe access to the 60-Day condition.&nbsp; To address the condition and prevent future accessibility issues, NuStar is determining the feasibility of performing a pipeline reroute. A Safety Related Condition Report was submitted regarding this anomaly on January 28, 2019. &nbsp; &nbsp;
- **truncated:** false
- **body characters:** 674
