{"operation":"document","citation":"PHMSA 20-179870","title":"MOBIL PIPE LINE COMPANY — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2020-04-10","effective_on":"2020-04-10","summary":"HAZARDOUS LIQUID in TX; REPAIR; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-20-179870-operator-12628.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-20-179870-operator-12628.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-20-179870-operator-12628","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"Pursuant 195.452(h)3, ExxonMobil Pipeline Company (EMPCo ), on behalf of Mobil Pipe Line Company, is providing notice to Railroad Commission of Texas and Pipeline and Hazardous Materials Safety Administration that one (1) 180 -day repair condition will not be remediated within the repair schedule. This is due to the&nbsp;water levels around the Trinity River that is impacting access to the location of the repair condition.","truncated":false,"body_characters":426}