# COX OPERATING LLC — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 20-184100
- **title:** COX OPERATING LLC — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2020-06-10
- **effective on:** 2020-06-10
- **summary:** HAZARDOUS LIQUID in LA; REPAIR; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-20-184100-operator-39498.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-20-184100-operator-39498.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-20-184100-operator-39498
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

Pursuant to §195.452, Cox Operating, LLC (Cox) is making this notification to inform PHMSA and LA DNR of a delay in addressing a 60-Day condition following a geometry tool run on line MMS48480 that took place January 8th, 2020 (discovered April 13th, 2020).&nbsp; The line is approximately 10.7 miles long and located off-shore and into the coastal region of Louisiana.&nbsp; The feature in question was called as a 3.6% dent with associated metal loss at the 7:00 position at 55,819.9 feet.&nbsp; Due to current operational constraints resulting from Covid-19 restraints, shut-in facilities, and tropical storm Cristobal the feature will not be repaired prior to the 60 day deadline.
- **truncated:** false
- **body characters:** 684
