# ENABLE OKLAHOMA INTRASTATE TRANSMISSION, LLC — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 20-187341
- **title:** ENABLE OKLAHOMA INTRASTATE TRANSMISSION, LLC — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** current
- **official:** true
- **published on:** 2020-07-24
- **effective on:** 2020-07-24
- **summary:** GAS TRANSMISSION in OK; PRESSURE; PHMSA status: UNDER REVIEW.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-20-187341-operator-26330.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-20-187341-operator-26330.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-20-187341-operator-26330
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

In accordance with 49 CFR § 192.933(a)(2) and § 192.18, Enable Midstream Partners, LP, is providing a notification of a temporary pressure reduction which will exceed 365 days. The anomaly resulting in the temporary pressure reduction was not located in an HCA but Enable Midstream is making a courtesy notification per § 192.933(a)(2) and § 192.18.
- **truncated:** false
- **body characters:** 349
