{"operation":"document","citation":"PHMSA 20-187494","title":"TOLEDO REFINING COMPANY, LLC — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2020-07-29","effective_on":"2020-07-29","summary":"HAZARDOUS LIQUID in OH; REPAIR; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-20-187494-operator-32572.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-20-187494-operator-32572.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-20-187494-operator-32572","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"Pursuant to Section 195.452(h)(3), Toledo Refining Company (TRC), OPID 32572, is providing this Integrity Assurance Notification to PHMSA that two (2), 180 day repair conditions, identified during the latest ILI, will not be remediated within the 195.452(h)(4)(iii) schedule. These conditions are located on Line 16-234, referred to as the TRC 8” Dock line. The line is located in Lucas County Ohio, is 2.08 miles in length, is located in HCA area’s, and is predominately used for transferring gas oil. TRC has this pipeline isolated and out of service. There will be no additional risk to health or the environment as the pipeline will remain out of service until the final two features can be verified and repaired as needed.","truncated":false,"body_characters":727}