{"operation":"document","citation":"PHMSA 20-191557","title":"UNITED STATES GYPSUM CO — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2020-09-10","effective_on":"2020-09-10","summary":"GAS TRANSMISSION in IA,NY,OR,PA; PROGRAM; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-20-191557-operator-20236.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-20-191557-operator-20236.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-20-191557-operator-20236","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"In accordance with 49 CFR 192.909(b) and 49 CFR 192.18, the United States Gypsum Company (USG) provides this notification of significant change to USG’s Integrity Management Program (IMP). The Revisions are in the attached documents under the Documents Tab.","truncated":false,"body_characters":257}