# UNITED STATES GYPSUM CO — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 20-191557
- **title:** UNITED STATES GYPSUM CO — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2020-09-10
- **effective on:** 2020-09-10
- **summary:** GAS TRANSMISSION in IA,NY,OR,PA; PROGRAM; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-20-191557-operator-20236.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-20-191557-operator-20236.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-20-191557-operator-20236
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

In accordance with 49 CFR 192.909(b) and 49 CFR 192.18, the United States Gypsum Company (USG) provides this notification of significant change to USG’s Integrity Management Program (IMP). The Revisions are in the attached documents under the Documents Tab.
- **truncated:** false
- **body characters:** 257
