{"operation":"document","citation":"PHMSA 20-197560","title":"ENERGY TRANSFER COMPANY — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"current","official":true,"published_on":"2020-12-03","effective_on":"2020-12-03","summary":"GAS TRANSMISSION in TX; INTERVAL; PHMSA status: UNDER REVIEW.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-20-197560-operator-32099.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-20-197560-operator-32099.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-20-197560-operator-32099","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"In accordance with 49 C.F.R. 192.18, Energy Transfer Company (ETC) (OPID 32099) submits this notification that it will require a six (6) month extension on the assessment of a segment of its North System natural gas pipeline as per 49 CFR § 192.939(b). The subject system segment is comprised of approximately eleven (11) miles of 6-inch and six (6) miles of 4-inch piping and the MAOP (500 psig) equates to less than 30% of SMYS. The assessment due date is December 31, 2020. This segment will now be assessed on or prior to June 15, 2021.","truncated":false,"body_characters":540}