# ENERGY TRANSFER COMPANY — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 20-197560
- **title:** ENERGY TRANSFER COMPANY — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** current
- **official:** true
- **published on:** 2020-12-03
- **effective on:** 2020-12-03
- **summary:** GAS TRANSMISSION in TX; INTERVAL; PHMSA status: UNDER REVIEW.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-20-197560-operator-32099.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-20-197560-operator-32099.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-20-197560-operator-32099
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

In accordance with 49 C.F.R. 192.18, Energy Transfer Company (ETC) (OPID 32099) submits this notification that it will require a six (6) month extension on the assessment of a segment of its North System natural gas pipeline as per 49 CFR § 192.939(b). The subject system segment is comprised of approximately eleven (11) miles of 6-inch and six (6) miles of 4-inch piping and the MAOP (500 psig) equates to less than 30% of SMYS. The assessment due date is December 31, 2020. This segment will now be assessed on or prior to June 15, 2021.
- **truncated:** false
- **body characters:** 540
