# CENTRAL VALLEY GAS STORAGE (CVGS), LLC — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 20-197669
- **title:** CENTRAL VALLEY GAS STORAGE (CVGS), LLC — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2020-12-04
- **effective on:** 2020-12-04
- **summary:** GAS TRANSMISSION in CA; PROGRAM; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-20-197669-operator-32603.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-20-197669-operator-32603.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-20-197669-operator-32603
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

Pursuant to 49 C.F.R. § 192.909, the purpose of this notification is to make you aware of a significant change to our Integrity Management Plan (IM Plan).&nbsp; Central Valley Gas Storage (CVGS) has added the potential threat of stress corrosion cracking (SCC) to its IM Plan.&nbsp; While CVGS has not previously considered SCC as a potential threat, our Southern Company Gas affiliated utility, Atlanta Gas Light, has identified SCC on a pipeline in Georgia.&nbsp; &nbsp;
- **truncated:** false
- **body characters:** 472
