{"operation":"document","citation":"PHMSA 20-198126","title":"PIEDMONT NATURAL GAS CO INC — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2020-12-14","effective_on":"2020-12-14","summary":"GAS TRANSMISSION in NC; REASSESSMENT INTERVAL ABOVE 30% SMYS; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-20-198126-operator-15518.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-20-198126-operator-15518.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-20-198126-operator-15518","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"In accordance with 192.18, attached is a request from Piedmont Natural Gas (Piedmont) for a 6-month extension on the 7-year reassessment interval pursuant with 192.939.","truncated":false,"body_characters":168}