{"operation":"document","citation":"PHMSA 21-207781","title":"HILCORP NORTH SLOPE, LLC — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2021-03-03","effective_on":"2021-03-03","summary":"HAZARDOUS LIQUID in AK; REPAIR; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-21-207781-operator-1541.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-21-207781-operator-1541.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-21-207781-operator-1541","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"Description of Condition: Hilcorp North Slope, LLC is providing notice that a condition evaluated on the Prudhoe Bay Natural Gas Liquids pipeline (NGL) cannot be remediated within the scheduled 60-day timeframe per 49 CFR §195.452(h)(4)(ii)(B). Scheduled repair work has been temporarily delayed due to extreme cold weather. Type A Sleeve repairs will be completed as weather conditions improve. We estimate that this repair will be performed by 4/3/2021, resulting in a 90-day timeframe.","truncated":false,"body_characters":488}