{"operation":"document","citation":"PHMSA 21-208088","title":"FLORIDA CITY GAS — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2021-03-12","effective_on":"2021-03-12","summary":"GAS TRANSMISSION in FL; REASSESSMENT INTERVAL ABOVE 30% SMYS; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-21-208088-operator-2432.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-21-208088-operator-2432.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-21-208088-operator-2432","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"Pursuant to USDOT CFR Title 49 Sections 192.909 and 192.18 and PHMSA “ Notice of Stay of Enforcement and Notice of Enforcement Discretion to Operators Affected by the Coronavirus (COVID-19) Outbreak” issued on March 20, 2020 , a notification is hereby given in reference to changes that have substantially affected FCG Transmission Integrity Management Program’s implementation.","truncated":false,"body_characters":378}