{"operation":"document","citation":"PHMSA 21-211233","title":"WOLVERINE PIPELINE CO — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2021-04-23","effective_on":"2021-04-23","summary":"HAZARDOUS LIQUID in MI; PRESSURE; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-21-211233-operator-22830.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-21-211233-operator-22830.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-21-211233-operator-22830","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"As required in 49 CFR Part 195.452(h)(1 )(ii), Wolverine Pipe Line Company is reporting a pressure reduction exceeding 365 days.&nbsp;","truncated":false,"body_characters":134}