{"operation":"document","citation":"PHMSA 21-224502","title":"SHELL PIPELINE CORP — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2021-09-15","effective_on":"2021-09-15","summary":"GAS TRANSMISSION in LA; REASSESSMENT INTERVAL ABOVE 30% SMYS; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-21-224502-operator-18273.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-21-224502-operator-18273.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-21-224502-operator-18273","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"The purpose of this notification is to request a 6-month extension of the 7-year reassessment interval per 49 CFR Part 192.939(a). The assessment was scheduled prior to the 7-year calendar date but delays related to Hurricane Ida require us to extend the proposed assessment date past the due date.","truncated":false,"body_characters":298}