# SHELL PIPELINE CORP — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 21-224502
- **title:** SHELL PIPELINE CORP — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2021-09-15
- **effective on:** 2021-09-15
- **summary:** GAS TRANSMISSION in LA; REASSESSMENT INTERVAL ABOVE 30% SMYS; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-21-224502-operator-18273.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-21-224502-operator-18273.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-21-224502-operator-18273
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

The purpose of this notification is to request a 6-month extension of the 7-year reassessment interval per 49 CFR Part 192.939(a). The assessment was scheduled prior to the 7-year calendar date but delays related to Hurricane Ida require us to extend the proposed assessment date past the due date.
- **truncated:** false
- **body characters:** 298
