{"operation":"document","citation":"PHMSA 21-231535","title":"SOUTHERN CALIFORNIA GAS CO — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"current","official":true,"published_on":"2021-12-08","effective_on":"2021-12-08","summary":"GAS TRANSMISSION in CA; REASSESSMENT INTERVAL ABOVE 30% SMYS; PHMSA status: UNDER REVIEW.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-21-231535-operator-18484.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-21-231535-operator-18484.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-21-231535-operator-18484","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"In accordance with 49 CFR § 192.939(a)1, SoCalGas is requesting a 6-month extension of the 7-calendar year reassessment interval for the on-shore, intrastate pipeline listed in Table 1. (Table 1 is attached in the documents section of this notification)","truncated":false,"body_characters":253}