# SOUTHERN CALIFORNIA GAS CO — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 21-231535
- **title:** SOUTHERN CALIFORNIA GAS CO — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** current
- **official:** true
- **published on:** 2021-12-08
- **effective on:** 2021-12-08
- **summary:** GAS TRANSMISSION in CA; REASSESSMENT INTERVAL ABOVE 30% SMYS; PHMSA status: UNDER REVIEW.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-21-231535-operator-18484.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-21-231535-operator-18484.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-21-231535-operator-18484
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

In accordance with 49 CFR § 192.939(a)1, SoCalGas is requesting a 6-month extension of the 7-calendar year reassessment interval for the on-shore, intrastate pipeline listed in Table 1. (Table 1 is attached in the documents section of this notification)
- **truncated:** false
- **body characters:** 253
