{"operation":"document","citation":"PHMSA 22-241131","title":"SUNOCO PIPELINE L.P. — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2022-04-08","effective_on":"2022-04-08","summary":"HAZARDOUS LIQUID in TX; PRESSURE; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-22-241131-operator-18718.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-22-241131-operator-18718.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-22-241131-operator-18718","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"Per 195.452(h)(1)(ii) Sunoco Pipeline L.P. (SPLP) an Energy Transfer Partnership Company, is notifying PHMSA of a pressure reduction that will exceed 365 days.","truncated":false,"body_characters":159}