{"operation":"document","citation":"PHMSA 22-250205","title":"ENTERPRISE PRODUCTS OPERATING LLC — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2022-07-21","effective_on":"2022-07-21","summary":"HAZARDOUS LIQUID in LA; PRESSURE; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-22-250205-operator-31618.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-22-250205-operator-31618.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-22-250205-operator-31618","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"Per 49 CFR 195.452(h)(1)(ii), this letter is submitted by Enterprise Products Operating LLC (“Enterprise”) as a notification that a temporary pressure reduction implemented for the subject pipeline will exceed the 365 days on July 22, 2022. The subject pipeline is a 46.153-mile intrastate pipeline that transports HVL products.","truncated":false,"body_characters":328}