# EAGLECLAW MIDSTREAM VENTURES — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 22-252244
- **title:** EAGLECLAW MIDSTREAM VENTURES — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2022-08-02
- **effective on:** 2022-08-02
- **summary:** GAS GATHERING in TX; START/END POINT DELAY ONSHORE; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-22-252244-operator-39271.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-22-252244-operator-39271.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-22-252244-operator-39271
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

Kinetik and its subsidiary’s operate gas, crude, water, and natural gas liquids (NGL) assets in the Permian Basin in West Texas. Reeves County houses the largest portion of operations of the five counties in which we operate. These operations include gathering, compression, processing, transportation, and water management services required to bring natural gas liquids and crude oil to market. With 41 compressor stations, four (4) processing plants and over 1700 miles of pipe, the natural gas gathering rule has a significant impact to operations. Pursuant to §192.8(b)(2), Kinetik is contacting the Pipeline Hazardous Materials and Safety Administration (PHMSA) and the State of Texas Railroad Commission.
- **truncated:** false
- **body characters:** 710
