{"operation":"document","citation":"PHMSA 22-252983","title":"HESS ND — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2022-08-15","effective_on":"2022-08-15","summary":"GAS GATHERING in ND; START/END POINT DELAY ONSHORE; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-22-252983-operator-39065.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-22-252983-operator-39065.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-22-252983-operator-39065","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"Pursuant to 49 CFR § 192.8(b)(2) and 49 CFR § 192.18, Hess Corporation and Hess Midstream Partners LLC, together with their subsidiaries and affiliates (collectively, “Hess”), hereby timely notify the Pipeline Hazardous Materials and Safety Administration (“PHMSA”) and the State of North Dakota Public Service Commission (“NDPSC”) of Hess’s request for a one year extension for determining if Hess’s onshore pipelines are “onshore gathering lines,” as required by 49 CFR § 192.8(a). For the reasons set forth below, Hess proposes an alternative deadline of November 15, 2023.","truncated":false,"body_characters":576}