{"operation":"document","citation":"PHMSA 22-259374","title":"PACIFIC GAS & ELECTRIC CO — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2022-10-31","effective_on":"2022-10-31","summary":"GAS TRANSMISSION in CA; MAOP RECONFIRMATION OTHER ECA TECHNOLOGY; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-22-259374-operator-15007.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-22-259374-operator-15007.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-22-259374-operator-15007","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"As required by the California Public Utilities Commission (CPUC) in Decision 11-06-017 and PHMSA in rule §192.624 MAOP Reconfirmation, please see the attached documents for PG&E’s MAOP reconfirmation.","truncated":false,"body_characters":200}