# ENTERPRISE PRODUCTS OPERATING LLC — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 23-268159
- **title:** ENTERPRISE PRODUCTS OPERATING LLC — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2023-02-14
- **effective on:** 2023-02-14
- **summary:** GAS GATHERING in NM; COMPLIANCE DELAY TYPE C; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-23-268159-operator-31618.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-23-268159-operator-31618.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-23-268159-operator-31618
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

In accordance with§ 192.18, Enterprise Products Operating LLC ("Enterprise"), OPID 31618, is respectfully requesting that the Pipeline and Hazardous Materials Safety Administration (PHMSA) approve an alternative to the May 16, 2023 deadline in § 192.9(g) for complying with the requirements' in 49 C.F.R. 192.9(e)(l )(ii). As explained in more detail below, an alternative compliance deadline is necessary because of supply chain interruptions preventing the timely procurement of materials and equipment to complete corrosion prevention related projects and a highly limited resource pool ( ex. construction contractors and technical personnel) from which the entire industry is relying upon to assist with meeting the requirements in 49 C.F.R. Part 192 for Type C gathering lines.
- **truncated:** false
- **body characters:** 782
