# SFPP, LP — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 23-280360
- **title:** SFPP, LP — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2023-06-30
- **effective on:** 2023-06-30
- **summary:** HAZARDOUS LIQUID in CA; PRESSURE; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-23-280360-operator-18092.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-23-280360-operator-18092.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-23-280360-operator-18092
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

Per 49 CFR 195.452(h)(1)(ii) operators are required to notify PHMSA when a pressure reduction resulting from in-line inspection response conditions exceeds 365 days and requires operators to provide the reason for the delays. Please find SFPP’s notification attached. LS-9 is in San Joaquin County in the City of Stockton and it is an interstate line. ETA: Operator changed from Interstate to Intrastate per e-mail attached in documents. Switching regulator from WE region to CA_SFM (Crystal Stewart PHP-6)
- **truncated:** false
- **body characters:** 506
