{"operation":"document","citation":"PHMSA 23-280363","title":"SFPP, LP — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"current","official":true,"published_on":"2023-06-21","effective_on":"2023-06-21","summary":"HAZARDOUS LIQUID in CA; PRESSURE; PHMSA status: UNDER REVIEW.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-23-280363-operator-18092.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-23-280363-operator-18092.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-23-280363-operator-18092","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"Per 49 CFR 195.452(h)(1)(ii) operators are required to notify PHMSA when a pressure reduction resulting from in-line inspection response conditions exceeds 365 days and requires operators to provide the reason for the delays. Please find SFPP’s notification attached.","truncated":false,"body_characters":267}