{"operation":"document","citation":"PHMSA 23-288060","title":"PACIFIC GAS & ELECTRIC CO — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2023-09-18","effective_on":"2023-09-18","summary":"GAS TRANSMISSION in CA; MAOP RECONFIRMATION METHOD 6; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-23-288060-operator-15007.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-23-288060-operator-15007.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-23-288060-operator-15007","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"Pacific Gas and Electric Company (PG&E) has performed a comprehensive evaluation of all station features at its Gilroy Calpine Station to reconfirm Maximum Allowable Operating Pressure MAOP).1 This station is in Gilroy, California and provides regulated gas supplies to alpine Corporation PG&E's initial phase of this project identified all traceable, verifiable, and complete (TVC records to reconfirm MAOP based on design and pressure test records. Seventeen (17) joints at Gilroy Calpine Station were identified as having non-TVC records of a pressure test in this review. The joints considered in this evaluation are located in both a high consequence area (HCA) and a Class 3 location. PG&E proposes to establish a TVC MAOP record via 49 Code of Federal Regulations (CFR) § 192.624(c)(3), Method 3.2","truncated":false,"body_characters":804}