# PACIFIC GAS & ELECTRIC CO — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 23-288064
- **title:** PACIFIC GAS & ELECTRIC CO — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2023-09-18
- **effective on:** 2023-09-18
- **summary:** GAS TRANSMISSION in CA; MAOP RECONFIRMATION METHOD 6; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-23-288064-operator-15007.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-23-288064-operator-15007.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-23-288064-operator-15007
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

Pacific Gas and Electric Com an PG&E) has performed a comprehensive evaluation of all station features at its Musco Family Olive Company Meter & Regulator Station Musco Olive Station to reconfirm Maximum Allowable Operating Pressure (MAOP .1 This station is in Trac California and regulates and meters gas to serve the large volume customer, Musco Family Olive Company PG&E's initial phase of this project identified all traceable, verifiable, and complete TVC records to reconfirm MAOP based on design and pressure test records. Two (2) joints at the Musco Olive Station were identified as having non-TVC records of a pressure test in this review. The joints considered in this evaluation are not located in either a high (HCA) or moderate consequence area (MCA) and are located in a Class 3 location. PG&E proposes to establish a TVC MAOP record via 49 Code of Federal Regulations (CFR) § 192.624(c)(3), Method 3.
- **truncated:** false
- **body characters:** 915
