{"operation":"document","citation":"PHMSA 23-288414","title":"ENABLE GAS TRANSMISSION, LLC — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2023-09-26","effective_on":"2023-09-26","summary":"GAS TRANSMISSION in AR; PRESSURE; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-23-288414-operator-602.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-23-288414-operator-602.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-23-288414-operator-602","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"Pursuant to Code of Federal Regulations (CFR) Title 49 Section 191.23, Enable Gas Transmission (EGT) an Energy Transfer Partnership Company, is notifying PHMSA of a pressure reduction that will exceed 365 days. A Safety Related Condition report was filed on September 28, 2022, for the subject pipeline. A 20% reduction in operating pressure was taken and has remained in effect to date (see attached report).","truncated":false,"body_characters":409}