{"operation":"document","citation":"PHMSA 23-291645","title":"FREEPORT LNG DEVELOPMENT, L.P. — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2023-10-31","effective_on":"2023-10-31","summary":"GAS TRANSMISSION in TX; REASSESSMENT INTERVAL ABOVE 30% SMYS; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-23-291645-operator-32206.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-23-291645-operator-32206.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-23-291645-operator-32206","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"Freeport LNG Development, L.P. (FLNG) operates an 11.2 mile, 42\" natural gas interstate transmission line in Brazoria County, Texas, authorized by FERC under Section 3 of the Natural Gas Act and regulated by PHMSA. This pipeline is a private use line that solely supports FLNG's natural gas pretreatment, liquefaction and liquefied natural gas (LNG) export facilities. At present, the 7-year In-Line Inspection (ILI) testing requirement for this transmission line is due on February 1, 2024. Based upon the reasons set forth herein, FLNG requests a six-month extension to the compliance timeline in accordance with 49 CFR § 192.939 and§ 192.18.","truncated":false,"body_characters":644}