{"operation":"document","citation":"PHMSA 23-295025","title":"MIDCONTINENT EXPRESS PIPELINE LLC — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2023-12-15","effective_on":"2023-12-15","summary":"GAS TRANSMISSION in AL,LA,MS,OK,TX; REASSESSMENT INTERVAL ABOVE 30% SMYS; PHMSA status: OBJECTIONS RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-23-295025-operator-32436.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-23-295025-operator-32436.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-23-295025-operator-32436","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"This attached letter is a request for a schedule extension concerning the integrity reassessment interval for two pipeline segments on the Midcontinent Express Pipeline LLC (MEP). The two segments are the CS 802 to Macon Bayou; Macon Bayou to Transco. The current compliance deadline for both segments is December 31, 2023. MEP is requesting an extended deadline of June 15, 2024, for reasons communicated within the attached letter including to maintain product supply to the market during the winter heating months in accordance with 49 CFR 192.943(a).","truncated":false,"body_characters":554}