# KINDER MORGAN TEXAS PIPELINE CO — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 23-295065
- **title:** KINDER MORGAN TEXAS PIPELINE CO — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** current
- **official:** true
- **published on:** 2023-12-15
- **effective on:** 2023-12-15
- **summary:** GAS TRANSMISSION in TX; REASSESSMENT INTERVAL ABOVE 30% SMYS; PHMSA status: UNDER REVIEW.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-23-295065-operator-31451.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-23-295065-operator-31451.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-23-295065-operator-31451
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

This attached letter is a request for a schedule extension concerning the integrity reassessment interval for one intrastate pipeline segments on Kinder Morgan Texas Pipeline LLC (KMTP). The segment is identified as Crosby to Houston Ship Channel. The current compliance deadline for both segments is December 31, 2023. KMTP is requesting an extended deadline of June 30, 2024, for reasons communicated within the attached letter including to maintain product supply to the market during the winter heating months in accordance with 49 CFR 192.943(a). KMTP’s request for a June 30, 2024 reassessment date for the 16-inch pipeline sections is supported by a 14.9 year calculated reassessment interval based on the results and repair data from the latest successful ILI tool run, per ASME B31.38S.
- **truncated:** false
- **body characters:** 795
