{"operation":"document","citation":"PHMSA 23-295066","title":"KINDER MORGAN TEJAS PIPELINE — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"current","official":true,"published_on":"2023-12-19","effective_on":"2023-12-19","summary":"GAS TRANSMISSION in TX; REASSESSMENT INTERVAL ABOVE 30% SMYS; PHMSA status: UNDER REVIEW.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-23-295066-operator-4900.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-23-295066-operator-4900.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-23-295066-operator-4900","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"This attached letter is a request for a schedule extension concerning the integrity reassessment interval for one intrastate pipeline segment on Kinder Morgan Tejas Pipeline LLC (KM Tejas). The segment is identified as the “Pennzoil Lateral”. The current compliance deadline for this lateral is December 31, 2023. KM Tejas is requesting an extended deadline of on or before May 1, 2024, for reasons communicated within the attached letter including to maintain product supply to the market during the winter heating months in accordance with 49 CFR 192.943(a)(2). KM Tejas’ request for a May 1, 2024 reassessment date for this 6-inch (6”) and 12-inch (12”) pipeline is supported by a 12.31 year calculated reassessment interval per ASME B31.38S.","truncated":false,"body_characters":745}