{"operation":"document","citation":"PHMSA 24-298252","title":"PACIFIC GAS & ELECTRIC CO — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"current","official":true,"published_on":"2024-01-19","effective_on":"2024-01-19","summary":"GAS TRANSMISSION in CA; ECA MECHANICAL DAMAGE EVALUATION; PHMSA status: UNDER REVIEW.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-24-298252-operator-15007.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-24-298252-operator-15007.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-24-298252-operator-15007","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"PG&E is planning to use an engineering critical assessment (ECA) procedure to prioritize severity and determine response or repair actions when dents or mechanical damage are encountered in accordance with 49 CFR §192.712(c)(11).","truncated":false,"body_characters":229}