# ITC PIPELINE COMPANY, LLC — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 24-301071
- **title:** ITC PIPELINE COMPANY, LLC — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2024-04-09
- **effective on:** 2024-04-09
- **summary:** HAZARDOUS LIQUID in TX; TECHNOLOGY; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-24-301071-operator-39509.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-24-301071-operator-39509.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-24-301071-operator-39509
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

The pipeline segments in question do not accommodate ILI tools and the hydrotest assessment method cannot be applied without causing significant disruption in operations to multiple operators, thus justifying ITC’s decision on the use of Other Technology Guided Wave method. Furthermore, Guided Wave Assessment provides valuable information on the full profile of the pipe, which allows for better identification of areas of interest on the pipeline, like corrosion, and allows for a more proactive approach in the mitigation of such defects. As prescribed under §195.452(j)(5)(iv) ITC has selected Other Technology Guided Wave for a continual integrity assessment and is notifying OPS 90 days before conducting the assessment
- **truncated:** false
- **body characters:** 726
