# PEABODY MUNICIPAL LIGHT PLANT — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 24-311726
- **title:** PEABODY MUNICIPAL LIGHT PLANT — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** current
- **official:** true
- **published on:** 2024-06-10
- **effective on:** 2024-06-10
- **summary:** GAS TRANSMISSION in MA; MAOP RECONFIRMATION TIME EXTENSION; PHMSA status: UNDER REVIEW.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-24-311726-operator-30919.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-24-311726-operator-30919.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-24-311726-operator-30919
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

Pursuant to§§ 192.624(b)(3) and 192.18, we are writing to formally request a 12-month extension for compliance with the Mega Rule, specifically regarding the reconfirmation of maximum allowable operating pressure (MAOP) pursuant to§ 192.619 Maximum Allowable Operating Pressure: Steel or Plastic Pipeline. As you are aware, the Mega Rule, implemented in July 2020, mandates that pipeline operators produce MTRs for all pipeline fittings dating back to the original installation of the pipeline. Although we have MTRs for the installed pipeline as well as pressure test information, our records are incomplete, and we are currently unable to provide MTRs for underground fittings as required by the regulation.
- **truncated:** false
- **body characters:** 709