{"operation":"document","citation":"PHMSA 24-312363","title":"ONEOK TEXAS GAS STORAGE, LLC — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2024-04-22","effective_on":"2024-04-22","summary":"GAS TRANSMISSION in CO,IA,IL,IN,KS,KY,MN,MO,MT,ND,NE,NM,OK,TN,TX,WI,WY; PROGRAM; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-24-312363-operator-31534.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-24-312363-operator-31534.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-24-312363-operator-31534","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"OpIDs: 12498, 21252, 30629, 30630, 31286, 31531, 31534, 31582, 31712, 32109, 32363 The Applicable Operators hereby notify PHMSA of a 192.909(b) change to their Integrity Management Program. Pipeline risk was previously evaluated with a relative risk model. Pipeline risk will now be evaluated with a quantitative risk model","truncated":false,"body_characters":323}